Hello. In this lesson I will take you through 3 ideas, one at a time.
Why it matters: Where to stop the agents and put a person in the loop. After each idea I will ask you one quick question.
In this lessonFollows you as you read
Gates by cost of error
The short version: Not every step needs a person.
Not every step needs a person. Put gates where an error is expensive or cannot be undone: the plan, the screen designs, the data model, anything touching payments or personal data, and the release. Let agents run freely on low-risk work such as copy changes and layout fixes, checked by tests.
A useful test is to ask what happens if this step is wrong and nobody notices for a week. If the answer is a rebuild, a data leak or a store rejection, it needs a gate.
Which step most needs a human gate?
What a reviewer checks
The short version: Give reviewers a short checklist per gate, not a general request to look it over.
Give reviewers a short checklist per gate, not a general request to look it over. At the design gate: every screen in the sheet exists, the brand is right, the flows have no dead ends. At the data gate: every field has a reason, access rules are stated, nothing sensitive is stored without need.
The agent should hand over its own summary: what it did, what it was unsure about and what it skipped. Reviewers find problems faster when the agent names its doubts.
What makes a review gate fail in practice?
Keeping gates fast
The short version: Gates fail when they are slow.
Gates fail when they are slow. Set a time limit, name a backup reviewer and keep each review small. Ten screens reviewed today is better than sixty reviewed next week.
Record each decision with the reason. The record trains the next build: if reviewers reject the same thing three times, change the agent instructions so it stops happening.
- Gate the plan, design, data, payments and release
- Checklists beat general reviews
- Agents should report their own doubts
- Slow gates are the main risk to the schedule
For an online store app, list five gates. For each, write the reviewer, a three-item checklist and the time limit.